Someone wants proof of waterproofing that is already under tiles, or about to be. We inspect waterproofing, investigate leaks and provide independent reports on what we find. Sydney-wide inspections against AS 3740 and AS 4654 where they apply.
Enquire Now
We inspect the waterproofing after the membrane goes on and before tiles cover it: coverage, corners and junctions, where the membrane ends and the slope to the drain, checked against AS 3740 or AS 4654.2, whichever applies. Anything we find that doesn't match the standard is flagged in writing while it can still be fixed.
The room is already tiled and a council, a certifier or a buyer wants proof. We record what can still be established: material at accessible drains and where pipes pass through, the slope of the finished floor, junctions and seals, moisture indicators, and whatever records exist. The report says plainly what can't be verified without opening up.
We look for where the water is getting in without opening anything up: moisture readings, drains, junctions and seals, and with your agreement a simple tap, waste or spray test. We put what we find in writing and, if you ask, give our technical opinion on the likely cause.
Your plumber or waterproofer runs the flood test, and we observe and record it from set-up to drain-down. On a room that's already tiled, the engineer on our team can attend and, if the results support it, issue a signed Engineer's Statement on Flood Test Results. It covers only what was tested (a floor test does not test the walls), it is not a compliance certificate, and whether to accept it is the council's or certifier's decision. How a flood test record works
Tell us what the evidence is for: who is asking and what they need to decide or, before tiling, when your tiler starts. We review whatever records you have and quote a fixed fee before anyone steps on site.
On site we photograph, measure the slope to the drain and take non-destructive moisture readings at drains, junctions and where pipes pass through. Before tiling we inspect the membrane itself. After tiling we record what can be reached.
A dated written report that keeps what the existing records say separate from what we observed, says what couldn't be verified without opening up and, if you ask for it, gives our technical opinion on the evidence. Ready to forward as it is, or to drop into an engineering report.
Inspection, testing and written reports.
We put what we find in writing and, if you ask, give our technical opinion on it. Whoever asked for the evidence decides whether to accept it.
Waterproofing inspection and consultancy specialist with extensive experience across residential, commercial, and government projects. Licensed waterproofing contractor. AIW member.
Waterproofing inspection and documentation specialist. On-site inspections, compliance reporting, and evidence capture for engineering consultants, builders, and strata across Sydney.
Need waterproofing inspection or documentation for an upcoming project?